Forecasting, Ordering and Manufacturing Process from Meeting 1999.11.24
since November 24, 1999, last modified November 24, 1999
Forecasting (MAIN)
- Forecast 1-2 year long term market sales
- The unit of forecasting is product based variants
- The history of forecast and real situation are recorded
Ordering (MAR)
- Pre order before 24 weeks are generated
- Before 4 weeks before production, the pre order is fixed as equipment variants (VALUE).
- The order is dilivered from Sales to Marketing
- The order can be chnaged before manufacturing (Order Change)
- The unit ordered is equipment variant.
Manufacturing (SAP)
- ERP for the order (equipment variant) generates material resouces.
- The ERP system generates BOM for purchasing after review the safty stock.
- The ERP system also has routining information and calculate their processing time.
Remarks for Engineering
- If an assembly in an engineering BOM is assembled by supplier, its sub parts may not be considered by ERP. They are considered by Part Development Team.
- The root parts attached to configuration items (EG-part) are dipicted in assembly drawings and considered by ERP.